No asbestos abatement is included in the bond because the district manages asbestos through its normal maintenance operations and the Healthy and Safe Schools and Buildings plan. There will be limited asbestos abatement in areas where construction and or additions require it. There isn’t an intention to abate asbestos as a standalone project.